Sign In | Join Free | My burrillandco.com
Home > AAC Block Machine >

Automatic Aerated Concrete Block Making Machine With400000m3 / Year

Changzhou Mingjie Building Material Equipment Manufacturing Co.,Ltd
Changzhou Mingjie Building Material Equipment Manufacturing Co.,Ltd
City: Changzhou
Province/State: Jiangsu
Country/Region: China
Tel: 86-519-68880160
Contact Person:
Mr Peter.Fly
    Buy cheap Automatic Aerated Concrete Block Making Machine With400000m3 / Year from wholesalers
     
    Buy cheap Automatic Aerated Concrete Block Making Machine With400000m3 / Year from wholesalers
    • Buy cheap Automatic Aerated Concrete Block Making Machine With400000m3 / Year from wholesalers

    Automatic Aerated Concrete Block Making Machine With400000m3 / Year

    Ask Lasest Price
    Brand Name : MINGJIE
    Model Number : QKJQ-0013
    Certification : ISO9001:2008
    Price : negotiable
    Payment Terms : T/T or L/C
    Supply Ability : 30sets/year
    Delivery Time : 45days after deposit
    • Product Details
    • Company Profile

    Automatic Aerated Concrete Block Making Machine With400000m3 / Year

    New Automatic Autoclaved Aerated Concrete Block Machine AAC Block Machine / AAC


    New Automatic AAC Block Equipments, Aerated Concrete Block Making Machine including400000m3/year,300,000m3/year, 200,000m3/year, 150,000m3/year, 100,000m3/year,etc


    AAC Block forming process


    1 High Automatic of the Preparing of Raw Materials

    A) The Preparing of Slurry

    B) The Preparing of Lime

    C) Cement

    D) Stone Powder

    E) Waste material

    2. Batching, Mixing, Pouring

    3. Resting and Pre-curing

    4. Demoulding, Cutting, Grouping

    5. Curing, Finished Product Leaving Autoclave

    6. The Reclaim System of Waste Water & Slurry


    Planning and Design:
    Factory covers an area of 15000m2 or so.

    There should be raw material area, finished block area and production area. Production process includes raw material disposal, rated material pouring, curing, cutting and steaming procedure.
    From building foundation to equipments installing and testing, to trial producing, it will take 4-5 months.


    Material:


    1. Fly ash: get dry ash from power plant
    2. Cement: cement in bulk
    3. Lime, gypsum and aluminum powder (buy in local area)


    Water, electricity and steam supply
    1. Water supply: build a well or use waste water
    2. Electricity supply: install a 315kv transformer


    Quality Automatic Aerated Concrete Block Making Machine With400000m3 / Year for sale
    Inquiry Cart 0
    Send your message to this supplier
     
    From:
    Enter your email please.
    To: Changzhou Mingjie Building Material Equipment Manufacturing Co.,Ltd
    Subject:
    Message:
    Characters Remaining: (0/3000)
     

    Home| Products| Suppliers| Quality Suppliers| Site Map |About Us |Contact Us |Help |关于我们 |联系我们

    Copyright © 2009 - 2018 burrillandco.com. All rights reserved.