Sign In | Join Free | My burrillandco.com
Home > AAC Block Machine >

Autoclaved Aerated Concrete AAC Fly Ash Brick Manufacturing Machine

Changzhou Mingjie Building Material Equipment Manufacturing Co.,Ltd
Changzhou Mingjie Building Material Equipment Manufacturing Co.,Ltd
City: Changzhou
Province/State: Jiangsu
Country/Region: China
Tel: 86-519-68880160
Contact Person:Mr Peter.Fly
    Buy cheap Autoclaved Aerated Concrete AAC Fly Ash Brick Manufacturing Machine from wholesalers
     
    Buy cheap Autoclaved Aerated Concrete AAC Fly Ash Brick Manufacturing Machine from wholesalers
    • Buy cheap Autoclaved Aerated Concrete AAC Fly Ash Brick Manufacturing Machine from wholesalers
    • Buy cheap Autoclaved Aerated Concrete AAC Fly Ash Brick Manufacturing Machine from wholesalers
    • Buy cheap Autoclaved Aerated Concrete AAC Fly Ash Brick Manufacturing Machine from wholesalers

    Autoclaved Aerated Concrete AAC Fly Ash Brick Manufacturing Machine

    Ask Lasest Price
    Brand Name : MINGJIE
    Model Number : QKJQ-0007
    Certification : ISO9001:2008
    Price : negotiable
    Payment Terms : T/T or L/C
    Supply Ability : 30sets/year
    Delivery Time : 45days after deposit
    • Product Details
    • Company Profile

    Autoclaved Aerated Concrete AAC Fly Ash Brick Manufacturing Machine

    Lightweight concrete Block AAC Block Machine / AAC Fly ash Block machine


    AAC Block Equipments, Aerated Concrete Block Making Machine 300,000m3/year, 200,000m3/year, 150,000m3/year, 100,000m3/year,etc


    AAC Block forming process

    1 The Preparing of Raw Materials

    A) The Preparing of Slurry

    B) The Preparing of Lime

    C) Cement

    D) Stone Powder

    E) Waste material

    2. Batching, Mixing, Pouring

    3. Resting and Pre-curing

    4. Demoulding, Cutting, Grouping

    5. Curing, Finished Product Leaving Autoclave

    6. The Reclaim System of Waste Water & Slurry


    Planning and Design:


    Factory covers an area of 15000m2 or so. There should be raw material area, finished block area and production area. Production process includes raw material disposal, rated material pouring, curing, cutting and steaming procedure. From building foundation to equipments installing and testing, to trial producing, it will take 4-5 months.


    Material:


    1. Fly ash: get dry ash from power plant
    2. Cement: cement in bulk
    3. Lime, gypsum and aluminum powder (buy in local area)


    Water, electricity and steam supply


    1. Water supply: build a well or use waste water
    2. Electricity supply: install a 315kv transformer



    Quality Autoclaved Aerated Concrete AAC Fly Ash Brick Manufacturing Machine for sale
    Inquiry Cart 0
    Send your message to this supplier
     
    From:
    Enter your email please.
    To: Changzhou Mingjie Building Material Equipment Manufacturing Co.,Ltd
    Subject:
    Message:
    Characters Remaining: (0/3000)
     

    Home| Products| Suppliers| Quality Suppliers| Site Map |About Us |Contact Us |Help |关于我们 |联系我们

    Copyright © 2009 - 2018 burrillandco.com. All rights reserved.